
Water Tank
The water tank, manufactured by Bricher, was acquired to ensure adequate pressure in the water distribution network. This tank is mounted on a robust metal structure that guarantees its stability and durability. Its capacity allows a constant supply of water to all homes in the military neighborhood.

Soldiers Installing Pipes
During the project, soldiers collaborated in the installation of PEAD pipes for drinking water and PVC pipes for sewage. This coordinated and precise work ensures a durable and efficient installation of essential service networks for the community.

Installed Hydrant
Hydrants were installed at strategic points in the neighborhood to ensure quick and efficient access in case of fires. These devices are essential for public safety and the maintenance of the water network.

Sewer and Water Pipes
In this image, you can see the water and sewer pipes installed in parallel. The choice of materials, such as PEAD for drinking water and PVC for sewage, meets the specific needs of resistance and durability in each case.

Air Valve in the Water Network
The air valves installed in the water distribution network allow the release of accumulated air, preventing damage and ensuring a constant and uninterrupted flow. These valves are crucial for the proper functioning of the system.





More Images
To showcase the scope of the project and the coordination required to complete the installation of the water and sewer systems.
Trenching for the water and sewer pipes, demonstrating the careful planning and excavation needed to ensure proper placement and stability of the pipelines.
Safety measures implemented on-site, including protective gear and safety barriers, ensuring the well-being of all workers during the project.
Engagement with the local community, including informational sessions and feedback meetings, to ensure transparency and address any concerns related to the project.

Under Construction – Trips
